Level
Cement mixing tub
Shovel
Trowel
Hole coring machine with 4” bit
Access to water hose
Materials to build brace
Core holes no less than 3” diameter (4” recommended) and no less than 6” deep into sidewalk. Place Broadway Rack into hole making sure the rack is level. Fill hole with Por-Rok or epoxy grout. 34-36” of the Broadway Rack should remain above the surface. Make sure Hitch is level and held in place until the grout has completely set.

Stake Method:

Sleeve Method:
