Complete installation instructions are also included in the PDF brochure download located in the upper right corner of this page.
2. Place both Uprights in position and place the Cross Beam on top of the Uprights. Secure the Cross Beam to each Upright with at least two 5/8 x 5.5β bolts placed diagonally from each other.
3. After checking that the unit is square and that the minimum setbacks have been achieved, anchor the Uprights to the floor with 5 wedge anchors each.
4. Starting at one end of the Cross Beam and working your way to the other, place a Cantilever Assembly and secure it with four 5/8 x 5.5β bolts. Check to make sure the Cantilever Assembly is at 90ΒΊ to the Cross Beam. After tightening the fourth bolt, retighten all four bolts.
5. Place and secure the rest of the Cantilever Assemblies with alternating Up and Down Cantilever Assemblies.
6. Place the Lower Trays in position on the ground with alternating Up and Down Lower trays. The Lower Trays should be in between the Cantilever Assemblies. The front edge of the Up and Down Lower Trays are coincident and 60β from the back edge of the Upright base flange. Secure the Lower Trays to the ground with wedge anchors in the rear holes and drive anchors in the front holes.