Tools Needed for Installation
Tape Measure
Marker or chalk
Level
Sledge Hammer
Rubber Mallet
Large Hammer Drill
Standard Drill
3/8" Socket with drill attachment
5/8" Diameter Masonry Bit
7/16" Wrench/Socket
15/16" Wrench/Socket
1.5" Wrench/Socket
Spud Wrench
Heavy Lifting Equipment and Strap

1. Place Uprights based on footing diagram and drill (4) 5/8" diameter holes in concrete 11" deep for each Upright. Drive in Simpson Strong-Bolts and install washers and nuts finger-tight. It's helpful to place a sheet of rubber or thick cardboard between the anchor and Upright to avoid hitting the Upright with the hammer.

2. Lift the Center in place and fasten finger-tight with (8) 5/8x7.5" bolts, lock washers and nuts.

3. If building a Kolo shelter with Dero Decker racks, lift the Dero Decker Beam in place and fasten with (8) 5/8x7.5" bolts, lock washers and nuts.

4. If building a Kolo shelter with Dero Campus racks, lift the Campus Rack in place and fasten with (8) 5/8x7.5" bolts, lock washers and nuts
5. If building a modular system of Kolo shelters, continue to place and fasten Uprights, Center Weldments, and Dero Decker Beams/Campus Racks.
6. Fully tighten all above bolts and nuts. Then tighten Simpson Strong-Bolt nuts to 230 ft-lbs.

8. Fully secure the Rafters with (6) 5/8x7.5" bolts, (12) lock washers, and (6) nuts for each pair of Rafters

10. Continue installing the remaining Polycarbonates, Polycarbonate Drops, Polycarbonate Edges, and Polycarbonate Flanges.

11. Place the Roof Cap on top of the shelter and secure with (2) ΒΌ"x6.5" bolts, (4) washers, and (2) lock nuts. Do not over-tighten to avoid bowing of the Roof Cap.

12. If installing Dero Decker bike racks, see Dero Decker instructions.