Level
Cement mixing tub
Shovel
Trowel
Hole coring machine with 4” bit
Access to water hose
Materials to build brace
Core holes no less than 4” diameter (5” recommended) and no less than 6” deep into sidewalk. Place Recycle Racks into holes, making sure the rack is level. Fill holes with Por-Rok or epoxy grout. Make sure the rack is level and held in place until the grout has set. The horizontal bar of the rack must be 34-35” above grade.

Sleeve Method: