Track Rack / installation

Important note before installing!

Make sure the ceiling is strong enough to accommodate the rack fully loaded with bikes. Compare parts shipped with rack to the parts list on the previous page. Contact Dero if any parts are missing. Make sure the 96" Slotted Track will fit in your space. If necessary, cut the Slotted Track to the required length.

Installation


install step 1
1 Mount Channel Trolley Supports in ceiling with appropriate anchors so that the centers of the brackets are 2 feet from each end of the 96" Slotted Track and 4 feet apart from each other.
install step 2
2 Slide 96" Slotted Track through the Channel Trolley Supports so that the centers of the brackets are 2 feet from the end of the Slotted Track.
install step 3
3 Secure the Channel Trolley Supports onto the 96" Slotted Track by tightening the Hex Head Cap Screws and Flange Nuts through the holes in the Channel Trolley Supports.
install step 4
4 Insert a 1/2" Carriage Bolt into the last slot and fasten 3 Washers and a Tamperproof Nut. Finish by hammering in an End Cap.
install step 5
5 Insert the Trolleys into the open end of the 96" Slotted Track.
install step 6
6 Insert the hooks through the holes in the tabs that are hanging down from the Trolleys. Each hook length should be at least 3" different than the neighboring hook.
install step 7
7 If no more Track Racks are going to be spliced together, hammer in another End Cap in the open end of the Slotted Track to close it up.
install step 7
8 If splicing an additional length of track, slide the Splice Slotted Track over the last 6" of the 96" Slotted Track.